Mizrahi-Tefahot Campus, Lod

OKA Architects Initiator
Israel David Engineers Constructor
11 Floors
46,000 מ”ר Total Area
Under Construction Status

The Project

The Mizrahi-Tefahot Bank Campus (Netzivim Nichnasim and Equipment Ltd.)
A new building currently under construction, joining the existing Mizrahi-Tefahot campus. The new building is being constructed and connected to the existing structure while maintaining continuous operations by the bank’s teams within the campus buildings.

The campus project involves joint work by BST Construction along with finishing works by BuildUP. The building was designed by OKA Architects, in collaboration with Israel David Engineers (Structural Engineers), consisting of an 11-story building, including a rooftop, with a total area of approximately 46,000 sqm. of above-ground space and an underground parking lot.

Status: Under construction, expected occupancy: December 2025.

Talk to us

Group offices:

Greenwork Business Park, Swiss House (Building E)

Ground Floor, Kibbutz Yakum 6097200

Phone: 09-7889161 | Fax: 09-7798323

    Fields marked with * are mandatory.







    I consent to storing my information in BST Group’s databases and using it according to the privacy policy; I understand that providing this information is not mandatory by law, but I won’t receive the service without it.